2491 W Iliff Ave, Denver, CO 80219

New Fire Line Tap Connections to Municipal Mains in Denver

An independent, licensed plumbing contractor. Not affiliated with Denver Water or the City and County of Denver.

A fire line tap connection is the new physical connection made between a municipal water main and a property's fire suppression system, using a tapping sleeve and tapping valve so the work can be done on a live main. Denver Sewer and Water performs these connections for new construction, additions, and properties adding fire suppression to an existing building.

  • Wet taps on live mains using a tapping sleeve and tapping valve.
  • Tap sizing based on the fire suppression system's calculated demand.
  • Thrust restraint installed at the tap and along the new lateral.
  • Hydrostatic testing, flushing, and disinfection before the tap is accepted.
  • Coordination of permits and inspections with the water authority.

Get Your Free Quote!

Sewer Lines
Water Lines
Fire Lines
Storm Drains
Septic Systems

Independent, family-owned. Not Denver Water or a city agency.

Family Owned and Operated, Not the City Utility
Licensed and Insured
Second-Generation Specialists
Fast Response Across the Denver Metro

What Triggers a New Fire Line Tap Connection?

New commercial construction with a fire sprinkler or standpipe requirement needs its own dedicated tap sized for that system's demand, which is set through a hydraulic calculation performed as part of the fire protection design. Buildings adding suppression during a renovation or change of occupancy face the same requirement even though the building itself already exists.

In some cases a property has an existing domestic tap but no separate fire connection, and adding suppression means bringing in an entirely new tap rather than trying to feed the sprinkler system off the domestic service, which is rarely adequate for the required flow.

(720) 935-6221

When a new connection is typically required

  • New construction with a fire sprinkler or standpipe system.
  • An addition that increases the building's fire flow demand.
  • A change of occupancy that triggers a fire suppression requirement.
  • A renovation adding suppression to a building that never had it.
  • A site with only a domestic tap that cannot support fire flow demand.
Excavator digging a deep shored trench for a storm drain and fire line at a Denver commercial site
Commercial scale excavation for storm drains, fire lines, and taps.

How We Diagnose It

How the Tap Is Sized Before Installation

The fire protection engineer's hydraulic calculation sets the required flow and residual pressure the tap has to deliver. We confirm the main's available capacity at that location through a flow test before committing to a tap size, because the main's actual performance in the field does not always match what a distribution map suggests.

What we confirm before tapping

  • Required flow and pressure from the fire protection design.
  • Main size, material, and depth at the proposed tap location.
  • Available flow and pressure in the main at that point.
  • Utility conflicts along the proposed lateral route.

How a New Fire Line Tap Connection Is Made

  1. 1

    Confirm demand and locate utilities

    The required flow is confirmed against the fire protection design and all utilities along the route are located before excavation.

  2. 2

    Install the tapping sleeve and valve

    A tapping sleeve and tapping valve are installed on the main, and the tap is cut using a wet tap machine without interrupting service.

  3. 3

    Run and restrain the lateral

    The new lateral is installed from the tap to the building with thrust restraint at all fittings and bends.

  4. 4

    Test, flush, and disinfect

    The line is hydrostatically tested, flushed, and disinfected, with bacteriological sampling before it is placed in service.

  5. 5

    Inspection and acceptance

    The completed connection is inspected and accepted by the water authority before the fire suppression system is connected to it.

Contractor reviewing utility permit plans on a work truck tailgate with locate marks on the pavement
Locates, permits, and the right authority get handled before the first cut.

What Denver Customers Say About Working With Us

We had an underground water valve break on a Saturday. No fun and expensive to fix regardless of the repair company. Nevertheless, greatly apprecia
Daniel Reilly
Very direct and to the point. Extremely efficient and professional.
Sam Hayden
They cleared our drain where Roto Rooter couldn't and quoted us to replace the line under our concrete.
Jason Gold

What Drives Cost on a New Fire Line Tap Connection

Required tap size, set by the fire protection design's hydraulic demand, is the main driver, since larger taps require larger sleeves, valves, and restraint hardware. Distance from the main to the building, depth, and surface conditions along the route add to the scope.

Utility conflicts along the lateral route can add time and cost if other buried lines have to be crossed or relocated to make room for the new connection.

Call (720) 935-6221 with your fire protection design's flow requirement and we will scope the tap against it.

Frequently Asked Questions

Bringing a new fire suppression system online?

Call (720) 935-6221 to scope the tap against your system's design flow.