Abandonment and Cut-and-Cap Requirements
An independent, licensed plumbing contractor. Not affiliated with Denver Water or the City and County of Denver.
When a building is demolished or a service is replaced, the old water and sewer services usually must be killed at the main, not at the property line. Denver Sewer and Water is a private contractor. The authority sets the abandonment standard. We perform and document the work.
- Abandonment at the main, not the house.
- Required for demolition permits in most jurisdictions.
- Water and sewer handled differently.
- Inspection and documentation required.
- Private contractor, not the utility.
Get Your Free Quote!
What Abandonment and Cut-and-Cap Mean
Abandonment is the permanent disconnection of a service from the public system. Cut-and-cap describes the physical act: the service is cut and sealed so nothing can enter or leave the main through it.
The critical detail is location. Authorities generally require the kill at or near the main, because a service capped at the property line still leaves an open path in the public system and a leak path in the right of way.
Water and sewer are handled differently. Water is typically shut and sealed at the corporation stop or the tapping valve. Sewer is typically plugged at the connection with an approved material.
(720) 935-6221When Abandonment Is Required
- Demolition of a structure served by existing water and sewer.
- Replacing a service with a new tap at a different location.
- Upsizing where the old service is retired.
- Consolidating multiple services into one.
- Converting a property from public sewer to another arrangement.

How We Diagnose It
Who Authorizes the Tap and Who Performs the Tap
Denver Sewer and Water is a private, family owned and operated contractor. We are not Denver Water or the City and County of Denver. We do not issue permits, set fees, own the mains, or approve service. The utility or municipality with jurisdiction does all of that.
The water and wastewater authorities set the abandonment standard, issue the permit, inspect the work, and close the account. Many building departments will not release a demolition permit or a final without proof of proper abandonment.
Denver Sewer and Water excavates, performs the abandonment to the required detail, and provides the documentation the authorities and the building department need.
The authority authorizes. The licensed contractor performs. Below is the split for this type of work.
Authority Side and Contractor Side
- Authority: Sets the abandonment standard and required detail.
- Authority: Issues the abandonment permit and inspects the work.
- Authority: Closes the utility account and releases the demolition hold.
- Denver Sewer and Water: Locates the old service and the connection point at the main.
- Denver Sewer and Water: Excavates in the right of way with proper permits and traffic control.
- Denver Sewer and Water: Cuts, caps, plugs, or seals to the authority's detail.
- Denver Sewer and Water: Holds for inspection and provides documentation.
- Denver Sewer and Water: Backfills, compacts, and restores the surface.
How an Abandonment Runs
- 1
Records and Locating
We identify where the service actually connects, which is often not where records suggest.
- 2
Permits
Abandonment permits and right of way approvals are secured before excavation.
- 3
Cut, Cap, Inspect
The service is killed at the main to the required detail and the authority inspects before anything is covered.
- 4
Document and Restore
Documentation goes to the authority and the building department, and the surface is restored.

Work With a Contractor Who Handles the Paperwork Side Too
Abandonment Costs
Authority side includes permit and inspection fees and, where the work is in a street, right of way and pavement restoration charges.
Contractor side is driven by depth, location in the street versus the parkway, traffic control, and restoration requirements.
We do not publish fee amounts. Tap fees, plant investment fees, permit fees, and inspection fees are set by the authority with jurisdiction and change on their schedule, not ours. We confirm the current figures in writing with that authority for your address before work is scheduled.
Frequently Asked Questions
Related Tap Services and Municipal Process Pages
Denver Water Tap Installation
Who authorizes a water tap, who physically makes the connection, and how the two fit together.
Explore Denver Water Tap InstallationSewer Tap Installation
Connecting a property to a sanitary sewer main, from permit through inspection.
Explore Sewer Tap InstallationWater Service Line Upsizing
Increasing service size for added fixtures, fire service, or a remodel.
Explore Water Service Line UpsizingTap Permit Process in Denver
How a tap moves from application to authorized construction in Denver.
Explore Tap Permit Process in DenverSanitary Sewer Connection for New Construction
Sequencing the sewer connection inside a new build schedule.
Explore Sanitary Sewer Connection for New ConstructionTap Process in Aurora
Aurora runs its own water and sewer utility, so the process differs from Denver.
Explore Tap Process in AuroraDemolition or Service Replacement Coming Up?
We handle abandonment at the main and the documentation that releases your permit.